Transmission Planning Studies
Transmission Services develops plans and options for network transmission, interconnections, and control and data systems to meet service requests. Copies of completed transmission studies are available by request.
To request a copy of the study, please email the following information to studyrequest@bpa.gov; name, title, company, mailing address, and telephone number. BPA Transmission Services will then contact you with non-disclosure requirements. Upon approval, a copy of the study will be provided.
|
|
Performance Metrics
Transmission Service Request Studies
-
BPA-TS TPP-2008-092 2008 NOS Cluster Study
3/25/2009
-
BPA-TS TPP-2008-041 Powerex SIS (AREF 71926625+)
4/25/2008
-
BPA-TS TPP-2008-040 Powerex SIS (AREF 71926623+)
4/25/2008
-
BPA-TS TPP-2008-039 Powerex SIS (AREF 71926619+)
4/25/2008
-
BPA-TS TPP-2008-037 PAC Rock Creek- MidC SIS (71872570)
4/25/2008
-
BPA-TS TPP-2008-036 Finley Bioenergy SIS (71915090)
4/25/2008
-
BPA-TS TPP-2008-035 BPA-TS SIS (1472913)
4/25/2008
-
BPA-TS TPP-2008-034 PAC SIS (71642789)
4/25/2008
-
BPA-TS TPP-2008-024 PPM Slatt-John Day, Slatt-Big Eddy SIS (AREF 71492...
4/25/2008
-
BPA-TS TPP-2008-023 PSEI SIS (AREF 71487657+)
4/25/2008
-
BPA-TS TPP-2008-022 PacifiCorp SIS (AREF 71469578)
4/25/2008
-
BPA-TS TPP-2008-021 Powerex SIS (AREF 71444926+)
4/25/2008
-
BPA-TS TPP-2008-020 PacifiCorp SIS (AREF 1473081)
4/25/2008
-
BPA-TS TPP-2008-019 PSEI SIS (AREF 71503549)
4/25/2008
-
BPA-TS TPP-2008-018 PacifiCorp SIS (AREF 71507893+)
4/25/2008
-
BPA-TS TPP-2008-017 Mason PUD SIS (AREF 1472570)
4/25/2008
-
BPA-TS TPP-2008-016 Puget Sound Energy Saddleback SIS (AREF 71618267+)...
4/25/2008
-
BPA-TS TPP-2008-014 Horizon Sagebrush SIS (LTRQ 1139-1143)
4/25/2008
-
COI System Impacts Study for COI above 4800 MW
1/16/2008
-
PDCI System Impact Study for PDCI above 3100 MW
1/16/2008
-
System Impact Study for Horizon Wind Energy, PTP Request
12/04/2007
-
Facilities Study Report for COI (4800) and PDCI (3100)
8/20/2007
-
Montana to Northwest Cluster Study
7/26/2007
-
PDCI System Impact Study, PTP Requests 925 928 1266 1267 1354
3/05/2007
-
COI System Impact Study, PTP Requests 926 927 1351-01
3/05/2007
-
COI System Impact Study, PTP Requests 1176-01 1178 1180 1182
3/05/2007
-
COI System Impact Study, PTP Requests 1193-1200
3/05/2007
-
PDCI System Impact Study, PTP Requests 1201-1206
3/05/2007
-
Impact of Mint Farm Generation on TTC Across Allston-Keeler
1/22/2007
-
System Impact Study for Sherman County Wind Farm
6/20/2006
-
System Impact Study for Orion Energy, LLC
6/20/2006
-
Mint Farm Energy Center Sysytem Impact Study Report
6/20/2006
-
Idaho Power Company Columbia 230 To LaGrande Transmission
6/20/2006
-
System Impact Study for Oregon Trail Wind Farm, LLC
3/08/2006
-
System Impact Study for K3 Wind, LLC
3/08/2006
-
System Facility Study, Powerex PTP Requests 801, 802
3/08/2006
-
VINTAGE VALLEY TRANSFORMER, FINAL SYSTEM IMPACT STUDY
2/21/2006
-
Olympic Converter, LP Transmission Interconnection System Impact Study...
8/02/2005
-
Kittitas Valley Wind PTP Request 550-01 Final System Facility Study Re...
6/17/2005
-
Great Northern Power Development, LP Transmission Requests Final Syste...
-
PacifiCorp Montana to Pacific Northwest Transmission Requests Final Sy...
-
Sea Breeze Pacific Regional Transmission System Interconnection Feasib...
-
Eurus Combine Hills II, LLC. Final System Impact Study Report
-
Blue Sky Wind LLC (RES North America) Final System Impact Study Report...
This SIS has determined that system expansion is required to provide firm transmission service for Blue Sky request 668-01. The request #674 with POD at Troutdale is not addressed in this report. Required facilities to enable request 668-01 include:
- Completion of McNary-John Day 500 kV transmission line project.
- Completion of interconnection facilities as noted below.
- Franklin - Walla Walla 115 kV line reconductoring to minimum 1050 amps as required for the interconnection and transmission requests. BPA TBL has provided the developer with an Interconnection Feasibility Evaluation (IFE) and Interconnection Facilities Study (IFS) in order to interconnect the developer’s Blue Sky wind project with the FCRTS system. Those reports identified the following system requirements for interconnection:
- Construction of a 115 kV substation (Tucannon River) to loop-in BPAT’s North Lewiston - Walla Walla 115 kV line
- Upgrade of the existing 69 kV tie between BPAT’s Walla Walla substation and Pacificorp’s (PACW) 69 kV Walla Walla substations to at least 690 amps.
- The upgrade of station service equipment at BPAT''s Walla Walla Substation.
- Installation of a Remedial Action Scheme, with associated communications, that would trip generation at Blue Sky following line outages.
The full SIS report is available upon request from BPA TBL. February 1, 2005
-
Proposed Arlington Area Wind Farms Final System Impact Study
-
McNary-John Day Final System Impact Study Report for Point-of-Receipt ...
-
McNary-John Day Final System Impact Study Report for Point-of-Receipt ...
-
McNary-John Day Final System Impact Study Report for Point-of-Receipt ...
|