Bonneville Power Administration
Transmission Services
http://www.transmission.bpa.gov

TBL Home Page Skip Primary Navigation
Transmission Services Home Page
  BPA Home Triangle Bullet Point Transmission Services Triangle Bullet Point Business Triangle Bullet Point Customer Forums and Feedback Triangle Bullet Point ATC Methodology Triangle Bullet Point ATC Methodology
This is a spacer graphic
This is a spacer graphic Triangle bullet point Business with Transmission Services

This is a spacer graphic Triangle bullet point Account Executives

This is a spacer graphic Triangle bullet point Reserve and Schedule Transmission

This is a spacer graphic Triangle bullet point Rates and Tariff

This is a spacer graphic Triangle bullet point Business Practices

This is a spacer graphic Triangle bullet point Customer Involvement


Adjust your View!


  Link to USA.gov


ATC Methodology



Transmission Services has developed methodologies for calculating its available transfer capability (ATC) for both long-term and short-term transmission service. This methodology does not currently use Capacity Benefit Margins (CBM) in the calculation of ATC and ATC is not decremented by CBM for either normal or emergency conditions.

Information including official documentation, tools and assumptions, customer comments and access to the active work group is accessible below. Any general queries on either the long-term or short-term ATC methodologies should be submitted to techforum@bpa.gov.

ATC Methodology