Bonneville Power Administration
Transmission Services
http://www.transmission.bpa.gov

TBL Home Page Skip Primary Navigation
Transmission Services Home Page
  BPA Home Triangle Bullet Point Transmission Services Triangle Bullet Point Planning & Projects Triangle Bullet Point Wind Projects Triangle Bullet Point Combine Hills
This is a spacer graphic
This is a spacer graphic Triangle bullet point Operations

This is a spacer graphic Triangle bullet point Network Planning and Studies

This is a spacer graphic Triangle bullet point Non-Wires Solutions

This is a spacer graphic Triangle bullet point Transmission Projects

This is a spacer graphic Triangle bullet point Wind Projects

This is a spacer graphic Triangle bullet point Environmental Management

This is a spacer graphic Triangle bullet point Public Involvement


Adjust your View!


  Link to USA.gov


Wind Projects



Combine Hills Interconnection


Eurus Energy America Corporation has submitted a generation interconnection request to BPA to integrate up to 63 megawatts (MW) of power generated from the Combine Hills Wind Project in Umatilla County, Ore. to the Federal Columbia River Transmission System (FCRTS).

Interconnection would require BPA to connect to the Walla Walla-Pendleton 69-kilovolt transmission line and upgrade 5.8 miles. The transmission line upgrade would involve replacing several wood poles and stringing new conductor.

Schedule


A Categorical Exclusion under the Business Plan Environmental Impact Statement was completed in May 2005. As a result, BPA will offer contract terms for interconnection of 63 MW of power from the wind project into the FCRTS.


Combine Hills Wind Project Information