Completed Wind Projects
|
|
|
|
Condon
SeaWest is responsible for developing the Condon Wind farm located in central Oregon near the town of Condon. The wind farm has a peak output of 50 megawatts. The wind farm was energized December 2001.
The power generated from the Condon Wind farm is collected at the Condon Wind substation at 34.5-kilovolt (kV) and stepped up to 69-kV for interconnection to the BPA 69-kV DeMoss-Fossil transmission line, which is adjacent to the substation.
BPA provided metering, tap structures, relays, SCADA, and a communication radio link from the Condon Wind substation to BPA's Wasco radio station. Additionally, BPA provided remedial action scheme (RAS) service due to the limited capability of this line.
|
|
|
|
|