Bonneville Power Administration
Transmission Services
http://www.transmission.bpa.gov

TBL Home Page Skip Primary Navigation
Transmission Services Home Page
  BPA Home Triangle Bullet Point Transmission Services Triangle Bullet Point Planning & Projects Triangle Bullet Point Transmission Projects Triangle Bullet Point Photos Triangle Bullet Point Schultz-Wautoma
This is a spacer graphic
This is a spacer graphic Triangle bullet point Operations

This is a spacer graphic Triangle bullet point Network Planning and Studies

This is a spacer graphic Triangle bullet point Non-Wires Solutions

This is a spacer graphic Triangle bullet point Transmission Projects

This is a spacer graphic Triangle bullet point Wind Projects

This is a spacer graphic Triangle bullet point Environmental Management

This is a spacer graphic Triangle bullet point Public Involvement


Adjust your View!


  Link to USA.gov


Project Construction Photos



Prepping the site for start of construction activities.
Prepping the site for start of construction activities. Material arrives on site. TT-5 rebar being put into place. The Wautoma Substation is a major 500-kilovolt substation that will be the anchor point for a new transmission line.
High above ground, contractor crews put the finishing touches on a tower for the Hanford-Ostrander transmission line. Crews use a crane  to lower a tower section onto tower base for as part of tower erection. Wautoma Substation under construction. Tower leg assembly
Tower body is placed over the tower leg by helicopter.  Helicopter to the right is used to talk to the pilot and to give elevations. Helicopter places tower body on tower leg Helicopter prepares to take off after placing towers. Tower leg construction